Contract Administration in Childs Hill

From £1,950 plus VAT — fixed-fee or percentage JCT & NEC contract administration

Content updated: 13 November 2026.

Your contract administration appointment

Discuss the building works in Childs Hill with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.

  • Confirm the contract documents, responsibilities and communication arrangements.
  • Agree site visits and reporting, and assess changes and payment applications under the contract.
  • Define completion, defects-period and final-account tasks in the appointment.

For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.

Discuss your building contract

Inspections and communication

Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.

Variations, payments and completion

Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.

Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.

Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.

Contract planning in Childs Hill

Documented building context

Barnet’s local history records houses built in The Mead in the early 1850s and the later use of the name Granville Road. It also records the demolition of many small Victorian houses in the early 1960s. A surviving street name therefore does not establish that the building included in the project belongs to its earliest housing phase.

The council history distinguishes the earlier small houses around The Mead and Castle Inn from subsequent redevelopment. For an older house that remains, the useful project question is how its present accommodation relates to the original building and any later work, not whether it shares an assumed standard plan with all Childs Hill homes.

Barnet’s 2019/20 regeneration report describes the 1960s Granville Road estate as including three tall tower blocks and three lower-rise blocks at that time. That dated account distinguishes a specific estate from the older street history. It does not confirm the present layout or the details of any flat now being marketed.

The same 2019/20 council report records development activity at Granville Road and describes work then planned. A historical programme is not evidence that an item was subsequently completed, inspected or included in the current work scope. The current property and the documents supplied for it must be checked independently.

Childs Hill tender and contract decisions

A Granville Road or The Mead tender must identify the actual building phase rather than inherit the earliest date associated with the street. Establish the current layout, alterations and material evidence before specifying a refurbishment. Where an older house survives, show its rear additions and the junctions that need investigation. Where the instruction concerns a later block, use the block's own design and maintenance documents.

For shared fabric, confirm the employer's authority and access through the appropriate management arrangements. Separate a flat's internal package from roof, wall or common-service work. Record which survey information each tenderer has received and how unresolved conditions are allowed for. A JCT instruction should identify the authorised change and supporting evidence; the area's redevelopment history does not determine a contractor's entitlement or the extent of a leaseholder's responsibility.

Recent construction should be supported by actual completion and alteration records, not an old forecast. At handover, assemble the required test results, drawings and outstanding-items list against the work sections in the executed contract. The project record should make clear which structure and components were included, particularly where a familiar street name covers both older housing and replacement development.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Who is responsible for the appointment?

Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.

Fees and information for a proposal

Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.

Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.

Childs Hill contract administration questions

How should a Granville Road tender distinguish an older house from a replacement block?

Use the actual building phase, current layout and alteration records. Show the house’s rear junctions or the block’s own envelope and services, rather than applying the street’s earliest history to both.

What evidence should support a recently completed part of the project?

Obtain actual completion and alteration records and relate them to the named structure. A past forecast cannot replace the tests, drawings and outstanding-items record required by this contract.

Discuss your building contract in Childs Hill

Tell us the scope and current stage so we can discuss a suitable appointment. Privacy policy.

Accountability

Provider

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064

Professional profiles · RICS regulation

Discuss the Childs Hill project