Your contract administration appointment

Discuss the building works in East Ham with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.

  • Confirm the contract documents, responsibilities and communication arrangements.
  • Agree site visits and reporting, and assess changes and payment applications under the contract.
  • Define completion, defects-period and final-account tasks in the appointment.

For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.

Discuss your building contract

Inspections and communication

Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.

Variations, payments and completion

Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.

Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.

Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.

Contract planning in East Ham

Documented building context

Newham's 2024 character study describes East Ham as largely domestic, with terraced housing along gridded streets. It maps the neighbourhood as a character area rather than identifying the construction and alteration history of every house within it. A continuous terrace therefore provides context, but cannot establish that the building being altered retains its original internal plan.

The study describes High Street North as a centre with active ground-floor uses and approximately two residential storeys above. This differs from the wholly residential terrace streets. Its account is a townscape description, not evidence that a particular upper-floor flat has the same access, ownership or maintenance arrangement as another along the frontage.

A terraced frontage can leave the rear arrangement largely unexplained in property photographs. For an East Ham project, provide views of the back where available and describe any changes between the main roof, a rear projection and a later addition. These are questions about the instructed house, not a statement that the neighbourhood has a particular pattern of defects.

The study explains that East Ham's edges are partly defined by infrastructure and partly by perceived character. Its map should not be used as a legal boundary for the property or as confirmation of conservation status. Check current council records for the exact address, including the documents supporting any extension or conversion described by the owner.

East Ham tender and contract decisions

An East Ham terrace refurbishment should separate the existing house from rear additions and altered upper accommodation on the tender drawings. The character study's grid description does not establish the internal plan or concealed structure. Define opening-up where the repair or alteration depends on evidence that is currently unavailable, and identify who supplies the resulting design.

At High Street North, draw the dwelling above commercial space together with its access and the relevant common elements. Give tenderers a consistent occupation and services-isolation brief. A change affecting a shopfront, stair or shared roof should be recorded against that component, with the applicable JCT instruction and valuation evidence kept together.

For rear roof work, specify the available access and temporary weather protection instead of relying on the street view. Programme inspection before key junctions are covered. At completion, reconcile the required drawings, tests and outstanding items with the issued work schedule. The character map provides context for the enquiry; it is not a current permission record or proof that every terrace component is identical.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Who is responsible for the appointment?

Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.

Fees and information for a proposal

Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.

Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.

East Ham contract administration questions

What should the tender show for work above High Street North shops?

Include the dwelling, its entrance and relevant shared elements. Agree occupation and services isolation, then locate each change to the shopfront, stair or roof in the instruction record.

What information is needed for rear-roof repairs on a terrace?

Establish rear access and temporary weather protection from the actual property. Show additions and altered upper rooms, and arrange inspection of relevant junctions before they are covered.

Discuss your building contract in East Ham

Tell us the scope and current stage so we can discuss a suitable appointment. Privacy policy.

Accountability

Provider

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064

Professional profiles · RICS regulation

Discuss the East Ham project