Your contract administration appointment
Discuss the building works in Esher with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in Esher
Documented building context
Elmbridge’s ESH02 account distinguishes early-twentieth-century houses on Hillbrow Road from post-war development on Lakeside Drive. It describes larger detached buildings on generous plots in the surrounding New Road, Esher Park Avenue and Milbourne Lane area. The common setting does not imply that these groups share one construction date or layout.
The 2012 guide identifies two weatherboarded cottages on Milbourne Lane dating from around 1810. It distinguishes those examples from the larger houses elsewhere in the character area. Their recorded form is useful context, but cannot establish the age or construction of every property along the lane.
Elmbridge records a mixture of offices, housing and retail premises along Portsmouth Road in its Esher centre account. That mix requires a more precise description when a project comprises accommodation above, behind or within premises that have changed use. A road address alone does not establish the limits of the dwelling.
The guide’s ESH04 account separates West End’s historic village core and green from later twentieth-century development around it. Its descriptions include cottages and modest building heights, contrasting with some of Esher’s larger detached-house settings. These are bounded character observations, not a statement that every home near the green is of the same period.
Esher tender and contract decisions
An Esher tender should distinguish the Hillbrow Road house from later Lakeside Drive development and from additions to the particular building. Identify the main range, extensions and external works on the issued plan. Ask the designer to resolve the actual construction and any uncertain connection before the price is treated as a complete repair proposal.
For a Milbourne Lane cottage enlarged into a larger home, separate retained fabric from later work in the schedule. Define access, temporary weather protection and inspection at the connection. A JCT instruction should identify the specific revised detail and supporting evidence, allowing the valuation to follow the authorised work rather than an assumed common building date.
At Portsmouth Road or West End, use the current occupation and plot records for the actual premises. Identify entrances and services that remain operational during construction. At completion, keep approved details, tests and outstanding items against each named element, distinguishing this package from separate future development. Elmbridge's character account does not establish current permission, condition or responsibility for every structure on the plot.
Identify the cottage-to-extension junction in the priced schedule so an allowance for the Milbourne Lane core cannot silently absorb work to a later wing.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Elmbridge: Esher Companion Guide, April 2012 — ESH01 centre; ESH02 paragraphs 3.12–3.18; ESH04 paragraphs 3.33–3.37
- Elmbridge: Design and Character SPD, replacement notice — Updates: Design Code replaces the 2012 guidance for applications submitted after 6 January 2025
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
Esher contract administration questions
How should a Milbourne Lane cottage and later wing be distinguished?
Identify their connection in the priced schedule, including investigation, protection and inspection. An allowance for the older cottage should not silently absorb work to the later extension.
What should Portsmouth Road work record about ongoing occupation?
Identify entrances and services that remain operational for the actual premises. Keep those arrangements with the programme and allocate completion information to the particular building elements included.
Discuss your building contract in Esher