Your contract administration appointment
Discuss the building works in East Sheen with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in East Sheen
Documented building context
Richmond’s Christchurch Road conservation-area statement describes Martindale and Spencer Gardens as two-storey Edwardian brick-and-tile terraces with gables or parapet features. It separately characterises The Mall as a Neo-Georgian group of detached and semi-detached houses, using red brick, pantile roofs and timber sash windows. These are identified subareas within one conservation setting, not a single specification for East Sheen.
East Sheen tender and contract decisions
A Martindale or Spencer Gardens terrace should have a tender schedule that distinguishes the gable or parapet at the frontage from the roof and rear junctions behind it. Richmond's account identifies those features in particular groups; the current survey must establish the materials and alterations at the instructed house. Ask the designer to define the repair and any required sample. Separate covering renewal, masonry work and window changes so contractors price the same scope and inspection stages.
A detached or semi-detached house in The Mall needs its own details for pantile roofs, sash windows and later side additions where those features are actually present. Do not transfer the terrace's access or quantities to that different arrangement. Record the interfaces between retained fabric and new work, together with investigation, temporary weather protection and making-good limits. If the exposed condition requires a revised detail, keep the finding with the JCT instruction and the evidence supporting its valuation or programme effect.
The site plan should identify the employer's plot, occupied rooms and authorised working routes. Confirm any private agreement needed for access beyond it through the appropriate adviser. At handover, use the same component references for approved details, tests, guarantees and outstanding work. A roof record should identify which slope or junction was treated, while a window record should identify the actual opening. The contract administrator cannot infer whole-house completion, planning permission or neighbouring repair responsibility from the area's architectural description.
Before inviting tenders, allocate design responsibility for each altered junction and confirm the information release programme. Selecting a JCT form should follow that allocation and the project's scope, rather than a general assumption that all East Sheen period houses require the same contract.
A Mall house’s sash replacement and pantile repair should retain separate approval and inspection records. Ask for the actual opening and slope references in the contractor’s proposals. This allows a later substitution request or outstanding item to be checked against the correct specification without extending one decision to an unrelated part of the property.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Richmond: Christchurch Road Conservation Area 13 statement — PDF page 2, Character subsections Martindale and Spencer Gardens; The Mall. No edition date inferred from designation chronology.
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
East Sheen contract administration questions
Can The Mall’s houses use a nearby terrace’s repair quantities?
Measure and specify the actual house, including its roof, sashes and additions. A Martindale or Spencer Gardens terrace provides context but cannot establish those quantities or access arrangements.
How should a sash substitution and pantile repair be documented?
Give each proposal its opening or roof-slope reference. Keep the accepted specification and inspection record separate so approval of one component is not extended to another position.
Discuss your building contract in East Sheen
Nearby contract administration
Accountability
Provider