Your contract administration appointment
Discuss the building works in Epsom with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in Epsom
Documented building context
The town-centre baseline report identifies a concentration of historic buildings around West Street, South Street and the Market Square at the western end of High Street. It describes red brick as predominant, alongside painted render, applied timber framing, pargetting, stonework, weatherboarding and terracotta. This range is recorded within the conservation-area context, not as a list of materials present in every Epsom house.
The baseline describes a generally two- to three-storey town-centre scale, with pitched and hipped tile or slate roofs, sometimes behind parapets. That roofscape raises a specific access question for a client: which slopes, edges and drainage details can actually be viewed from the positions available at the property?
The council records a fine-grained mix of shops and other commercial uses within the historic centre. For residential work within such a building, identify its relationship to the frontage and the rooms behind it. Do not assume that the shop’s entrance, rear yard or roof is available for the flat’s work package.
The baseline report forms part of the evidence for Epsom's town-centre planning work. Its description of surviving buildings and materials does not grant permission to change an instructed property, nor does it establish the approval history of an existing extension. Check the current council record and the exact conservation-area or listed-building position where relevant.
Epsom tender and contract decisions
For work in the West Street, South Street or Market Square setting, identify the actual material at each repair position. Red brick, render, timber decoration, weatherboarding and terracotta require distinct specification decisions. Ask the designer to state the treatment and sample requirements, and give tenderers measured locations rather than a general period-frontage description.
Roof work should distinguish the covering, hip, parapet and drainage junction affected by the design. Define access, temporary protection and investigation before concealment. If a hidden condition changes the repair, retain the evidence and authorised detail with the JCT instruction and valuation record. A streetscape description cannot establish the condition of the component or the contractor's entitlement.
Where accommodation sits above or behind commercial premises, show the occupied routes and interfaces in the tender. Confirm the employer's authority and any separate access arrangements through the appropriate advisers. Handover information should identify the actual dwelling, frontage or roof package, with outstanding items and required documents attached to it. A future alteration proposal remains separate from work completed under the present contract. Keep each frontage material separately identified.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Epsom Town Centre Master Plan Stage 1 Baseline Report — Epsom Town Centre Master Plan, Stage 1 Baseline Report (November 2023 within 2024 appendix), paragraphs 2.6–2.10, printed page 7 (PDF 16)
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
Epsom contract administration questions
Should a period frontage be priced as one repair item?
Separate the actual brick, render, timber decoration, weatherboarding and terracotta positions. Give tenderers the relevant treatments and sample requirements so unlike materials do not share an undefined allowance.
How should a concealed roof finding enter the contract record?
Locate the covering, hip, parapet or drainage junction affected. Retain the opening-up evidence and authorised revised detail with the instruction used to assess the change.