Contract Administration in Wandsworth Common

From £1,500 plus VAT — fixed-fee or percentage JCT & NEC contract administration

Content updated: October 2026.

Contract planning in Wandsworth Common

Documented building context

Wandsworth's published draft appraisal for The Common distinguishes Dorlcote Road's mainly two-storey semi-detached houses from Henderson Road's three-storey pairs in paragraph 6.8. Its architectural account describes gables, varied bay forms and red brick, and notes decorative iron balconies at Henderson Road nos. 29–35. This is a draft townscape description of named groups, not an adopted condition assessment.

Wandsworth Common tender and contract decisions

For an instruction involving one of the Dorlcote Road or Henderson Road groups, begin with the actual floor arrangement and elevations. The draft appraisal distinguishes two-storey and three-storey forms; it does not establish the present layout, occupation or extent of an individual refurbishment. Give tenderers the current drawings, identify inaccessible areas and state which further survey or design information will be issued before the work proceeds.

If the scope includes a gable or bay, allocate a separate item to its roof, wall and junction with the main building. Identify retained finishes around the operation so protection and making good can be priced. Ask each contractor to distinguish the proposed permanent repair from the access and temporary works needed to deliver it. An undivided facade allowance makes it difficult to compare whether those different activities have all been included.

For decorative ironwork at an instructed Henderson Road property, establish which components are present and which intervention the designer has specified. A photograph of an adjacent balcony is not a specification for the employer's building. Where closer examination is necessary, identify the information sought and the professional responsible for deciding the subsequent detail. Do not turn the appraisal's recognition of a balcony into an assertion about its present capacity, condition or suitability for use.

Prepare the tender programme around decisions that genuinely affect the sequence: access arrangements, any examination from a platform, an agreed repair detail and the procurement of the specified components. When choosing and completing the JCT documentation, align those stages with the actual allocation of design work. Clearly record which permissions or third-party arrangements remain to be obtained, by whom, and before which operation, without representing an anticipated outcome as a consent already held.

What should the Wandsworth Common tender and completion file make clear?

During delivery, use the original component references for instructions, progress photographs and valuation support. If a repair grows after examination, preserve the priced starting scope and explain the proposed addition. Ask for the corresponding programme effect as well as the amount. Completion records should distinguish installed work, items awaiting attention and any specialist information still outstanding; the final account should reconcile these records to the employer's accepted tender.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Accountability

Provider

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064

Professional profiles · RICS regulation

Discuss the Wandsworth Common project