Contract Administration in Wandsworth Common

From £1,950 plus VAT — fixed-fee or percentage JCT & NEC contract administration

Content updated: 13 November 2026.

Your contract administration appointment

Discuss the building works in Wandsworth Common with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.

  • Confirm the contract documents, responsibilities and communication arrangements.
  • Agree site visits and reporting, and assess changes and payment applications under the contract.
  • Define completion, defects-period and final-account tasks in the appointment.

For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.

Discuss your building contract

Inspections and communication

Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.

Variations, payments and completion

Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.

Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.

Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.

Contract planning in Wandsworth Common

Documented building context

Wandsworth's published draft appraisal for The Common distinguishes Dorlcote Road's mainly two-storey semi-detached houses from Henderson Road's three-storey pairs in paragraph 6.8. Its architectural account describes gables, varied bay forms and red brick, and notes decorative iron balconies at Henderson Road nos. 29–35. This is a draft townscape description of named groups, not an adopted condition assessment.

Wandsworth Common tender and contract decisions

For an instruction involving one of the Dorlcote Road or Henderson Road groups, begin with the actual floor arrangement and elevations. The draft appraisal distinguishes two-storey and three-storey forms; it does not establish the present layout, occupation or extent of an individual refurbishment. Give tenderers the current drawings, identify inaccessible areas and state which further survey or design information will be issued before the work proceeds.

If the scope includes a gable or bay, allocate a separate item to its roof, wall and junction with the main building. Identify retained finishes around the operation so protection and making good can be priced. Ask each contractor to distinguish the proposed permanent repair from the access and temporary works needed to deliver it. An undivided facade allowance makes it difficult to compare whether those different activities have all been included.

For decorative ironwork at an instructed Henderson Road property, establish which components are present and which intervention the designer has specified. A photograph of an adjacent balcony is not a specification for the employer's building. Where closer examination is necessary, identify the information sought and the professional responsible for deciding the subsequent detail. Do not turn the appraisal's recognition of a balcony into an assertion about its present capacity, condition or suitability for use.

Prepare the tender programme around decisions that genuinely affect the sequence: access arrangements, any examination from a platform, an agreed repair detail and the procurement of the specified components. When choosing and completing the JCT documentation, align those stages with the actual allocation of design work. Clearly record which permissions or third-party arrangements remain to be obtained, by whom, and before which operation, without representing an anticipated outcome as a consent already held.

During delivery, use the original component references for instructions, progress photographs and valuation support. If a repair grows after examination, preserve the priced starting scope and explain the proposed addition. Ask for the corresponding programme effect as well as the amount. Completion records should distinguish installed work, items awaiting attention and any specialist information still outstanding; the final account should reconcile these records to the employer's accepted tender.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Who is responsible for the appointment?

Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.

Fees and information for a proposal

Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.

Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.

Wandsworth Common contract administration questions

What should be established before specifying Henderson Road balcony ironwork?

Identify the actual components and the designer’s treatment, including any closer examination needed. The draft appraisal or a neighbour’s photograph cannot establish this balcony’s condition, capacity or repair detail.

How should a gable or bay repair that grows after examination be assessed?

Preserve its priced starting scope and identify the additional work against the same component reference. Retain the design response, supporting cost and proposed programme effect with the instruction.

Discuss your building contract in Wandsworth Common

Tell us the scope and current stage so we can discuss a suitable appointment. Privacy policy.