Cladding Safety Scheme & Building Safety Fund Support London

Funding advisory support for eligible cladding remediation schemes, technical evidence, application coordination and project delivery planning.

RICS RegulatedLondon-wideCompliance-led
RICS Regulated Firm No. 923064Professional Indemnity InsuredCompany No. 17085122
Get Started

Discuss fire and facade advice

Share the building type, height, tenure and any existing reports so we can identify the right next step.

Prefer to talk it through first? Call 020 7101 4590.

London Fire Safety & Facade

Funding Evidence

Funding applications and funded remediation projects need clear technical evidence, consistent project information and careful client-side coordination.

We provide advisory support for Cladding Safety Scheme and Building Safety Fund processes where appropriate, linking funding evidence with FRAEW, investigation, specification, tender and delivery stages. We are not the scheme administrator: eligibility and funding decisions sit with the scheme bodies, and we do not guarantee a funding outcome.

Before You Instruct

What to send, and what you receive

Share a few building details and we will confirm the right assessment or survey scope and a fee before you instruct.

What to send before we quote

  • The building address and postcode
  • Height or number of storeys, if known
  • Tenure and how the building is used
  • Any existing fire risk assessment or fire reports
  • Drawings or previous external wall information

What you receive

  • A written assessment, survey or review suited to the instruction
  • Findings and recommended next steps
  • A clear scope of what was and was not assessed

Some work can need specialist input (for example opening-up, laboratory analysis or a fire engineer); we set out where this applies and coordinate it where instructed. Ask what the report would include.

Scope

What this service covers

London buildings may have incomplete original records, historic cladding alterations and multiple stakeholder interests.

Funding route review

Early review of eligibility context, building information, external wall evidence and remediation programme requirements.

Technical evidence coordination

Review and collation of FRAEW, PAS 9980, intrusive investigation, material identification and remedial scope information.

Application support

Assistance with technical documentation and client-side coordination where funding applications require building consultancy input.

Cost and scope alignment

Support in aligning remedial scope, specification, tender returns and funding evidence.

Project delivery interface

Contract administration, monitoring and stakeholder reporting can support funded remediation delivery.

When To Instruct Us

When funding advisory support is needed

Clients usually come to us with fragmented evidence and an unclear route, not a scheme name. These are the typical triggers.

  • A block may be eligible for CSS or BSF support.
  • External wall evidence is fragmented across reports and parties.
  • A remediation scope needs aligning with funding requirements.
  • A responsible person needs help coordinating an application.
  • A FRAEW or external wall evidence needs collating into a case.
  • Funded works need contract administration and monitoring.
  • Stakeholders and leaseholders need clear communication.
  • You need to know whether a route is likely relevant before spending.
Compliance Context

London building safety context

Our support is practical and evidence-led, without guaranteeing funding outcomes or overstating scheme eligibility.

Our advice is evidence-led and written for serious property decision-makers. Where legal advice, specialist fire engineering input or statutory role appointments are required, those matters are identified clearly rather than implied.

For many London blocks the practical question is not whether the external wall needs work but who pays for it, and the Cladding Safety Scheme and Building Safety Fund exist to fund eligible remediation of unsafe cladding on qualifying residential buildings. Eligibility and the process are set by the scheme rather than by us, but both turn on technical evidence: a fire risk appraisal of the external wall, a clear scope of the defects and proposed remediation, and cost information that stands up to scrutiny. We help freeholders, RMCs and managing agents assemble and review that evidence, align the FRAEW and remediation scope with what the scheme expects, and coordinate the surveying inputs to an application. We are explicit that we support the technical case and do not determine funding decisions, and we keep leaseholders' interests in view given they carry the consequences of delay.

Outputs

Outputs and next steps

Evidence schedule

Structured list of information held, missing evidence and actions required.

Technical narrative

Clear explanation of external wall risk, investigation findings and remedial scope.

Procurement support

Tender and contractor information support where funding and project delivery overlap.

Stakeholder reporting

Communication support for managing agents, housing associations, freeholders and residents.

Fire Safety & Facade Cluster

Related fire safety and facade services

Priority Areas

Fire safety consultants across priority London areas

Professional Boundaries

What this service is — and is not

This is a technical evidence and project coordination service. We help collate and present the building information, FRAEW and external wall evidence, remedial scope and technical narrative that a funding route relies on, and we can coordinate delivery. We are not the scheme administrator: eligibility and funding decisions, amounts and timescales are determined entirely by the relevant scheme bodies against their criteria, and we do not guarantee any funding outcome.

We are not your solicitor; legal eligibility, leaseholder protections and recovery routes are legal matters on which we work alongside your legal advisers. Where a FRAEW, fire engineering or specialist input is required we identify it and coordinate competent specialists rather than implying it is covered.

London Inspection & Reporting Workflow

A representative funding advisory instruction

The following London inspection and reporting workflow breakdown shows how our RICS surveyors scope, inspect and report on real properties across London; see our published London surveying case studies for completed project records.

  • Typical client: a freeholder, managing agent or housing provider for an affected block
  • Typical building: a residential block with external wall remediation needs
  • Typical issue: fragmented evidence and an unclear route to funded remediation
  • Typical instruction: technical evidence coordination and application support

Not sure which assessment your building needs? Send the building information and we'll identify the right next step.

Send building information
FAQs

Cladding Safety Scheme & Building Safety Fund London FAQs

What is the Cladding Safety Scheme and the Building Safety Fund?

The Cladding Safety Scheme (CSS) and the Building Safety Fund (BSF) are government-backed routes that can fund eligible cladding and external wall remediation on qualifying buildings. They have their own eligibility criteria and processes, administered by the relevant scheme bodies. We provide technical evidence and project coordination support; we are not the scheme administrator and do not decide funding.

Do you guarantee funding approval?

No. Funding decisions sit entirely with the relevant scheme administrators against their criteria. We support the technical evidence and project coordination that an application relies on, but we cannot and do not guarantee eligibility, funding approval, the amount of funding, or timescales.

Can you help with Cladding Safety Scheme evidence?

Yes, where appropriate. We can help coordinate building information, the FRAEW and external wall evidence, material identification, the remedial scope and the technical narrative an application typically draws on, working alongside the responsible person and their advisers.

How does this link to FRAEW or PAS 9980?

Closely. A FRAEW carried out under PAS 9980 and the related external wall evidence usually underpin the remediation case and scope that a funding route considers. We help align that technical evidence with the remedial scope and the project programme.

Are you the scheme administrator?

No. We are an independent RICS regulated building consultancy providing technical and project support. The scheme administrators run eligibility and funding decisions; our role is to help present clear, consistent technical evidence and to coordinate delivery, not to administer the scheme.

What technical evidence does a funding route usually need?

Typically the building information and ownership position, a FRAEW or external wall fire risk evidence, material identification, the proposed remedial scope and specification, and cost information. The exact requirements depend on the scheme and the building, and we help identify and close the evidence gaps.

Can you monitor funded works?

Yes, subject to the appointment scope. Where remediation proceeds we can provide contract administration, clerk of works monitoring and client-side reporting so the funded works are delivered and evidenced consistently with the funding requirements.

Who is eligible for these funding routes?

Eligibility depends on the scheme criteria, including factors such as building height, the external wall construction and the type of defect, and these criteria change over time. We help establish whether a route is likely to be relevant before significant cost is incurred, but eligibility is determined by the scheme, not by us.

Can you act if a building is not eligible?

Yes. Where a building is not eligible, or eligibility is unclear, we can still advise on the external wall evidence, the remedial options and the practical routes forward, including how leaseholder protections and other funding or recovery routes may interact, alongside your legal advisers.

How early should we get advice?

As early as possible. Getting the technical evidence and the remedial scope right at the outset, and aligned with the scheme requirements, avoids wasted cost and delay later. Early coordination is usually the most valuable stage of this support.

Request a Consultation

Need CSS or BSF funding advisory for a London block? Call 020 7101 4590.

Request a Consultation
Reviewed by Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor at Hampstead Chartered Surveyors & Building Consultancy. Last reviewed: October 2026.
Direct Enquiry

Enquire about Cladding Safety Scheme & BSF Funding

Tell us briefly about the building and what you need. Your enquiry goes directly to our chartered surveying team.

We respond to enquiries within one working day.

Prefer to talk it through first? Call 020 7101 4590 or email enquiries@hampsteadcharteredsurveyors.co.uk.

We use the details you provide to respond to your enquiry. Read our Privacy Policy.

We respond to enquiries within one working day.

Scope & Fee Guide

Cladding Safety Scheme & Building Safety Fund Support London: Deliverables & Transparent Fee Matrix

Every cladding safety scheme & building safety fund support london instruction is confirmed by a fixed written fee proposal once the property address, tenure and scope are reviewed. Starting fees begin from £1,950 plus VAT; all fee guides below are exclusive of VAT (plus VAT).

Scope / Property BandDeliverables & Technical ScopeTypical TurnaroundTransparent Fee Guide (Excl. VAT)
Band A — Standard / Single-Property Cladding Safety Scheme & Building Safety Fund Support LondonPre-instruction document review, targeted site inspection or desktop appraisal, and structured RICS-aligned report.3–5 working days from inspectionFrom £1,950 plus VAT (CSS / BSF eligibility review, FRAEW audit & funding application scoping)
Band B — Comprehensive Cladding Safety Scheme & Building Safety Fund Support London InstructionFull site inspection, photographic defect/evidence schedule, regulatory analysis and prioritised cost/action plan.5–8 working days from site accessFrom £3,650 plus VAT (Homes England / GLA funding pack, cost plan & technical evidence submission)
Band C — Complex, Heritage or Multi-Unit Cladding Safety Scheme & Building Safety Fund Support LondonListed-building, higher-risk, multi-unit or portfolio instruction with senior director review and adviser coordination.7–12 working days (or agreed milestone)From £5,950 plus VAT (end-to-end grant milestone administration & remediation project oversight)